Post by technammech on Aug 29, 2023 16:27:39 GMT
In short. NO FLY UNTIL INSPECTED then every 25 Landings. FWD main gear attach bolt to composite structure until a MOD kit comes out.
|
|
|
Post by wlahey on Sept 8, 2023 0:16:29 GMT
Mandatory***
|
|
|
Post by technammech on Oct 2, 2023 13:43:54 GMT
Job Card 1882 is out for the Kit install.
|
|
|
Post by technammech on Nov 7, 2023 22:18:10 GMT
So the Kit has arrived from italy. We have flown it with approval for a reinspect after 25 landings with the current configuration in the picture per engineering. We have 2 more landings before we bring the airplane in for a 100 hr inspection. We will install the SB094 Kit at that time. I will post some pics when its done.
|
|
hilmi
New Member
Posts: 3
Home Airport: LTFB
|
Post by hilmi on Jan 1, 2024 6:17:38 GMT
View AttachmentSo the Kit has arrived from italy. We have flown it with approval for a reinspect after 25 landings with the current configuration in the picture per engineering. We have 2 more landings before we bring the airplane in for a 100 hr inspection. We will install the SB094 Kit at that time. I will post some pics when its done. i already done.. some pics for you. Use Job Card No.1882 carefully.
|
|
hilmi
New Member
Posts: 3
Home Airport: LTFB
|
Post by hilmi on Jan 1, 2024 6:29:05 GMT
Btw, i couldn't find Job Card No.1882 on reservedarea.tecnam. So i wrote to tecnam then they sent us. I'm sharing with you.
|
|